Educar II 学校 SESC-CE 项目位于Fortaleza的 Damas社区,在一个东西纵向的场地上,尺寸约为 350.00m x 50.00m,主干道有两个正面,其三个横向通道南部。除了这些条件之外,该项目还处理了一些预先存在的条件:为当地社区服务的小教堂;将翻新并纳入学校项目的体育馆;一栋旧楼,学校的一部分已经运作,但应该拆除以建造新楼。

The Educar II School SESC-CE project is located in the Damas neighborhood, in Fortaleza, on a longitudinal east-west site, with approximate dimensions of 350.00m by 50.00m, with two fronts for the main roads and also three transverse accesses in its southern portion. In addition to these conditions, the project also dealt with some pre-existing conditions: a chapel that serves the local community; a gymnasium to be renovated and incorporated into the school's project; and an old building where part of the school already operated but which should be demolished for the construction of the new building.


示意图


所要求的项目包括幼儿园教学区、基础 I 和 II、礼堂、课外活动区、自助餐厅和原有体育馆的翻新。因此,为了能够在现场以其现有条件、要求的程序和计划的时间表实施,该项目的设计遵循合理化、模块化协调和建筑工业化的逻辑,从结构到窗户,促进工作流程和缩短执行期限,此外还可以分阶段执行项目。

The requested program consisted of didactic blocks for kindergarten, fundamental I and II, an auditorium, a block for extracurricular activities, a cafeteria, and the renovation of the pre-existing gymnasium. Thus, to enable implementation on the site with its pre-existing conditions, the requested program, and the planned schedule, the project was designed within a logic of rationalization, modular coordination, and industrialization of construction, from the structure to the windows, facilitating the work process and reducing execution deadlines, in addition to enabling the execution of the project in phases.


剖面图

剖面图

剖面图


第一期已经建成,在土地最空旷的地方实施,在其西部,通过这一侧的主要道路和其中一条横向道路进入,并有小学二的教学区,街区用于课外活动、自助餐厅、健身房翻新和连接人行道。

第二阶段仍处于设计阶段,除拆除原有结构外,还包括东部及其通道,该结构可以在第一部分工程建成时继续使用。第一阶段的建筑不是作为孤立的街区分布,而是作为一个由建设性逻辑和程序分布管理的系统。它的实施占据了土地上现有结构的空隙,分配了程序,连接了通道,并引导了流量。 

Phase 1, already built, was implemented in the emptiest part of the land, on its western portion, with access through the main road on this side and in one of the transversal ones, and has the didactic block of elementary school II, the block for extracurricular activities, cafeteria, gym renovation and connecting walkways. Phase 2, still in the design phase, incorporates the eastern portion and its access road, in addition to the demolition of the pre-existing structure, which could remain in operation while the first part of the work was built. Phase 1 buildings are distributed not as isolated blocks, but as a system governed by constructive logic and a programmatic distribution. Its implementation occupies the voids of the existing structures on the land, distributing the program, connecting with the accesses, and directing the flows.


教学楼占地面积较大,占据了通往西面的主要通道,标志着入口。从那里,内部流被分配到程序的其他部分,服务访问发生在次要访问之一的更南端。这种对场地的占领以一种多孔的方式发生,创造了产生内部庭院的空隙,并用打破结构网格刚性的角度标记了入口。会面地点成为节目分发的条件和指南。值得注意的是,与建筑空间同样重要的是创造的空隙,负责这些社交空间,例如坡道所在的内部庭院,或场地北部广阔的线性公园,它们将学校综合体的不同部分。

With a larger area, the didactic block occupies the main access to the west and marks the entrance. From there, the internal flow is distributed to the other parts of the program, with service access taking place further south from one of the secondary accesses. This occupation of the site takes place in a porous way, creating voids that generate internal patios and marking accesses with angles that break the rigidity of the structural mesh. Meeting places emerge as a condition and guide for the distribution of the program. It is worth noting that, just as important as the built spaces are the voids created, responsible for these socializing spaces, such as the internal patio where the ramp is located, or the extensive linear park in the northern portion of the site, which unites the different sectors of the school complex.


平面图

平面图


从这个意义上说,颜色也作为一个中心元素进入,有助于标记通道和垂直循环并区分程序的不同部分,在建筑体积和外观结构中占主导地位的白色中性中充当指南,在一个暗示建筑和视觉识别之间非常集成的过程的空间中。金属结构适应项目的局限性,从1.20m的调制开始设计,克服了大跨度和重叠部分的内部空间组装,金属梁和蜂窝天花板上的钢甲板板,除了水平遮阳板的第二层表皮,保护内部环境免受阳光直射,并为建筑围护结构创造图案。

In this sense, color also enters as a central element, helping to mark the accesses, and vertical circulations and differentiating the different parts of the program, acting as a guide within the neutrality of white that predominates in the built volume and in its apparent structure, in a space that suggests a very integrated process between architecture and visual identity. The metal structure, adapted to the limitations of the project, was designed from the 1.20m modulation and overcomes large spans, and overlapping parts for the assembly of the internal spaces, with steel deck slabs on metallic beams and honeycomb ceilings, in addition to the second skins of horizontal sunshades that protect the internal environments from direct sunlight and create a pattern for the building envelope.


平面图

平面图


几种策略提供了环境舒适度。首先是在具有垂直和水平循环的环境中自然通风的可能性。此外,建造的天井将植被带入建筑物,改善空气湿度,窗户由水平固定的金属遮阳板保护。因此,符合人体工程学的舒适空间、充足的自然光线和通风,以及建筑空间和用于社交的绿色区域之间的密切关系,都保证了学生、教职员工的福祉。教室在对面的墙上都有窗户,允许交叉通风并防止 CO2 在其内部环境中积聚。

Several strategies provided environmental comfort. The first is the possibility of natural ventilation in environments with vertical and horizontal circulation. In addition, the patios created brought vegetation into the building, improving air humidity, and the windows were protected by horizontal fixed metallic sunshades. Thus, the well-being of students, faculty, and staff are guaranteed by ergonomically comfortable spaces, with abundant natural light and ventilation, and reinforced by the close relationship between built spaces and green areas for socializing. The classrooms have windows on opposite walls, allowing cross ventilation and preventing the accumulation of CO2 in their internal environments.




项目信息

建筑师:Rede Arquitetos
地点:巴西
面积:14000 ㎡
年份:2022
摄影:Igor Ribeiro

  • lijiawei411
    lijiawei411 沙发

    Educar II 学校 SESC-CE 项目位于Fortaleza的 Damas社区,在一个东西纵向的场地上,尺寸约为 350.00m x 50.00m,主干道有两个正面,其三个横向通道南部。除了这些条件之外,该项目还处理了一些预先存在的条件:为当地社区服务的小教堂;将翻新并纳入学校项目的体育馆;一栋旧楼,学校的一部分已经运作,但应该拆除以建造新楼。

    2023-06-16 10:04:16

    回复 举报
    赞同0
  • qq_1564129934747

    学习学习,赚点经验。

    2023-04-28 10:32:28

    回复 举报
    赞同0
这个家伙什么也没有留下。。。

公共建筑设计

返回版块

50.95 万条内容 · 410 人订阅

猜你喜欢

阅读下一篇

点亮现代建筑的无名大师,理查德·凯利

  ? Thomas Schielke 理查德·凯利(Richard Kelly)照亮了二十世纪几个最具代表性的建筑:   玻   璃屋、西格拉姆大厦和金贝尔艺术博物馆   ,等等。他的灯光设计策略出人意料地简单,但却非常成功。 玻璃屋 西格拉姆大厦 ? Flickr user: Ben Pentreath

回帖成功

经验值 +10